Vastwin

Nanshan production line import line project

From:广瀛物流 Posted on:2019-12-10 Belong to:Oil and gas refining


Equipment specifications: 25 pieces of equipment, 3758 tons. The largest part, 11.1*4.7*3.02 (m), 278 tons. 

Job Description: The outer wheel hook of Shandong Longkou Wharf is received by the board, and the short-term docking is temporarily stored at the dock. It is transferred to the Nanshan Aluminum Project for on-site delivery.